{
  "name": "AsterWell Operations",
  "slug": "asterwell-operations",
  "subtitle": "See the cost of time",
  "category": "operations",
  "description": "Compare drilling duration, fuel use and estimated carbon under stated assumptions.",
  "method": "Interval divided by penetration rate, with nonproductive time applied to total duration.",
  "limits": "Illustrative planning arithmetic; no well-control or safety decisions.",
  "provenance": "Original synthetic fixtures generated from the project engine. No operational or personal records.",
  "source_visibility": "private",
  "url": "https://mklab.co.technology/apps/asterwell-operations/",
  "run_url": "https://mklab.co.technology/apps/asterwell-operations/run/",
  "edition": "Precomputed synthetic browser edition",
  "publication_date": "2026-10-08"
}
